You cannot select more than 25 topics
Topics must start with a letter or number, can include dashes ('-') and can be up to 35 characters long.
928 B
928 B
quotesdb — Planning
Development Phases
Phase 0: Design (complete)
Finalized database schema, API endpoints, request/response shapes, auth model, and frontend routes.
Phase 1: Structure refactor (complete)
Collapsed api/, ui/, and tests/ sub-crates into a single quotesdb Cargo crate.
- Single
Cargo.tomlat project root with two binaries:apiandui - Shared code lives in
src/lib.rs - Integration tests live in
tests/as standard Cargo integration tests - Trunk moved to project root
Phase 2: Ticket Planning (pending)
Planning agents create nbd tickets for api, ui, and infra implementation work.
Phase 3: Implementation (pending)
Implementation agents work through domain tickets.
Work Log
- 2026-02-27 — Phase 0 complete. Project skeleton bootstrapped. Design doc written.
- 2026-02-27 — Phase 1 complete. Refactored to single-crate layout (ticket b38032).